Smiling technicians working on multiple Orbion propulsion modules in the lab.

Manufacturing · AS9100D Certified

The New Space company with an old soul.

Old Space earned its reputation for being slow and expensive. It also earned a lot of experience. We kept the rigor, discipline, and hard-earned lessons of building flight hardware— and left behind the idea that it has to take forever or cost a fortune.


The result is a manufacturing operation built for what comes next: higher volume, repeatable quality, faster delivery, and lower cost.

Where We Build

We’ve engineered the hardware, built the factory, developed the processes, and learned the lessons that only come from testing, manufacturing, flying, and supporting spacecraft.

This is where engineering becomes flight hardware. Where skilled hands, specialized equipment, and disciplined processes come together to build, assemble, and test propulsion systems. Our factory is built for repeatability, quality, and production at scale. Because building a great propulsion system once is an achievement. Building it reliably, again and again, is the business we’re in.

How We Build

Building flight hardware takes more than good engineering. It takes disciplined processes, complete traceability, and an uncompromising approach to testing.

Every system starts with carefully controlled components and moves through a deliberate sequence of assembly, inspection, integration, and verification. We test subsystems before they become modules. We test modules before they leave the factory.

Build. Test. Assemble. Test again. That’s how engineering becomes dependable propulsion hardware.

Receiving & Inspection

Good hardware starts with good inputs.

Scan

Ensure traceability through the entire build.

Inspect

Quality starts at the piece-part level.

Stock

Measured. Verified. Ready.

Subsystem Build & Test

Every subsystem is assembled and acceptance-tested in-house, keeping quality, configuration, and accountability under one roof.

HET

Every thruster goes through an extensive suite of tests culminating in hotfire.

PPU

The heart of every module is put through a battery of thermal and electrical testing.

PMA

The propellent management assembly is leak tested with its key components.

Module Integration & Test

This is where it all comes together. Proven components are assembled into the mission-ready configuration designed for your spacecraft.

Inventory pull

Acceptance tested components are stocked in inventory, reducing lead times and keeping production moving.

Module assembly & testing

Modules undergo full Test Like You Fly ATP before they leave our facility.

End-of-line Hotfire

Fully integrated module testing operates the product the way you will use it to verify performance before it leaves Orbion.

Delivery

Built, tested, fueled, and ready for integration. Your completed propulsion system ships in its mission-specific configuration, backed by the same Orbion team that engineered and built it. From there, we stay with you through spacecraft integration and on-orbit operations.

Final Checks

Laser measurement confirms critical dimensions and geometry match the design before the hardware moves forward.

Propellant Loading

Propellant loading is completed under controlled conditions and ensures every module arrives fully fueled and ready to go.

Ship to You

Next stop: your spacecraft.
Final hardware is packaged, protected, and shipped for integration.

The aerospace industry has a standard. We didn’t just meet it — we built our entire operation around it.

AS9100D certification is one part of a manufacturing system built for control, consistency, and traceability at every step. From receiving and inspection through subsystem build, testing, inventory, module assembly, and final acceptance, Orbion keeps the process—and accountability—under one roof.